Вы здесь

  • When hight mobility is need ARCMOV is the solution
  • Specially designed for high mobility and fast site erection
  • Reduced civil works and foundations
  • Prepared for productions up to 120 m3/hour;
  • 4 or 5 aggregates bins, up to 400m3 of total capacity
  • Prepared for road transportation with traction by truck
  • Optional: bins charge system, storing silos, filtering systems, additives batching, moisture control, etc.